![]() |
|||||||||
|
|
|||||||||
|
|
|||||||||
About UsBrisbane bathroom renovations and makeovers by Aquatic Bathrooms. We are long term members of the Queensland Master Builders Association (QMBA). Aquatic Bathrooms and all our tradesmen are QBSA licensed, trustworthy and reliable. Our aim is to provide a low cost, low maintenance, yet high quality result on completion, with the owner making their own choices in style, colour, tones and finishes. Due to the fact that most of our clients only have one bathroom, we structure the projects for completion in the shortest possible time, yet allowing each trade reasonable time in which to carry out their task, in a professional tradesman like manner. The average bathroom remodelling takes 7 days to complete, not including the shower screen and painting. Most of our clients choose to paint their own bathrooms, we can arrange painting if required. Our Schedule:- Day 1 & 2: Remove the fixtures, wall and ceiling sheets and the floor tiles. Change the plumbing and electrical. Install the bath and sheet the walls and the ceiling. Day 3: The plasterers set the walls and ceiling joints. Day 4: The plasterer hangs the cornice and sands ready for painting. In the afternoon of day 4, the waterproof membrane is applied. Day 5 & 6: The floor and walls are tiled. Day 7: The fixtures and accessories are installed. The shower screen is measured. (A standard screen takes approximately 5 days, a semi-frameless screen takes approximately 10 days and a frameless screen takes approximately 15 days). |
|||||||||
| |||||||||
|
|
|
|
|
|
|
|
|
||